88 01819011372

Project – 2

project-banner-1

PROJECT NAME : HDD RIVER CROSSINGS OF BAKHRABAD-SIDDHIRGANJ GAS TRANSMISSION PIPELINE PROJECT .

PROJECT LOCATION :  BANGLADESH

CONTRACT VALUE   :  USD 8.00 Million

DURATION                     :  8 MONTHS

YEAR                                :  2012 -2013

CLIENT

GAS TRANSMISSION COMPANY LIMITED

CONTRACTOR

 

 

MEARS-FERNAS- APEC – JV

Project -2

SCOPE OF HDD WORK INCLUDES:

  • Make survey and finalize final location of all river crossings.
  • Prepare HDD Profile, Transition Trench Profile. Anchor patterns for general HDD work and for pullback etc. • Rig positioning and Rig Anchoring.
  • Supervise and Monitor rigging operations, checking pipe stability adequate coverage below the river bed etc.

PROJECT DESCRIPTION :

GAS Transmission Company Limited (GTCL), a subsidiary of Petro-Bangla has awarded an EPCC contract to M/S FERNASS to construct a 30-inch 60 km Bakhrabad–Shiddhirganj Gas Transmission Pipeline. The extent of works include Design, Engineering, Procurement, Construction, Laying, Testing & Commissioning the 30 inch dia HP Gas Transmission Line from Bakhrabad Gas Field to Shiddhirganj Power station with river crossings, valve stations, scraper stations, Metering station at Bakhrabad, RMS at Haripur & Siddhirganj, CP system and SCADA /Tele-communication with optical fibre Cable.

The pipeline will provide more natural gas to Sidhirganj Peaking Power Plants.

APEC Energy Ltd. and Mears Group Inc., as Joint Venture, took the responsibility of laying pipeline under the rivers at 6 (six) different locations measuring a total of 4250 m length using SHORE Approach Horizontal Direction Drilling (HDD) design.